Property Type:
Multi-Tenant Commercial Campus
Building Size:
237,000 SF
Year Built:
Building 1 Developed 1980
Building 2 Developed 2018
Location:
Sand Diego, CA
Asset Redevelopment:
- Client purchased property in 2017 and added a new building in 2018.
- During re-development owner wanted to upgrade all the asphalt for leasing purposes.
- General contractor collected a bid from sub-contractor and submitted a $250,000 change order.
Project Outcome:
- SCS Identified inflated square footage of approx. 20%.
- Engineered scope to increase structural integrity and maximize coverage.
- Asphalt lifetime expectancy 10-15 years with minimal maintenance required.
- Total project savings in excess of $100,000.