Property Type:
Warehouse Distribution
Building Size:
228,800 SF
Year Built:
1997
Location:
Salt Lake City, Utah
Site Assessment & Peer Review:
- SCS completed an initial Site Assessment of the property.
- The client requested that SCS review the proposal from the selected contractor.
- The contractor was concerned about soil saturation.
- The client was worried about the scope and timing of the project with their asset strategy.
Project Outcome:
- Restructured the scope:
- Added geo grid fabric to increase the structural strength of the pavement.
- Reduced removals and added overlays to match the asset strategy and the tenant’s use of the building.
- With a quick peer review, we were able to save the client $25,000
- Further evaluation after the project was completed revealed more possibilities had SCS been involved sooner.